Technology companies have built electricity and artificial intelligence infrastructure to facilitate the AI boom of the 2020s. A 2025 report from the consulting firm McKinsey & Company estimated that by 2030, $2.7 trillion would be invested into AI infrastructure and data centers in the US, surpassing World War II's Manhattan Project every month. In January 2024, the International Energy Agency (IEA) released Electricity 2024, Analysis and Forecast to 2026. This is the first IEA report to make projections for data centers and power consumption by AI and cryptocurrency. The report states that power demand for these uses might double by 2026, with the additional power consumption equaling that of Japan. Power consumption by AI is responsible for an increase in fossil fuel use, and has delayed closings of obsolete, carbon-emitting coal energy facilities. A ChatGPT search involves the use of 10 times the electrical energy as a Google search. A 2024 Goldman Sachs Research Paper, AI Data Centers and the Coming US Power Demand Surge, found "US power demand (is) likely to experience growth not seen in a generation...." and forecasts that, by 2030, US data centers will consume 8% of US power, as opposed to 3% in 2022, presaging growth for the electrical power generation industry by a variety of means. Data centers' need for more and more electrical power is such that they might max out the electrical grid. The Big Tech companies counter that AI can be used to maximize the utilization of the grid by all. In 2024, The Wall Street Journal reported that big AI companies have begun negotiations with the US nuclear power providers to provide electricity to the data centers. In March 2024 Amazon purchased a Pennsylvania nuclear-powered data center for US$650 million. In September 2024, Microsoft announced an agreement with Constellation Energy to re-open the Three Mile Island nuclear power plant to provide Microsoft with 100% of all electric power produced by the plant for 20 years. Reopening the plant, which suffered a partial nuclear meltdown of its Unit 2 reactor in 1979, will require Constellation to get through strict regulatory processes which will include extensive safety scrutiny from the US Nuclear Regulatory Commission. If approved (this will be the first ever US re-commissioning of a nuclear plant), over 835 megawatts of power – enough for 800,000 homes – of energy will be produced. The cost for re-opening and upgrading is estimated at US$1.6 billion and is dependent on tax breaks for nuclear power contained in the 2022 US Inflation Reduction Act. As of 2024, the US government and the state of Michigan have been investing almost US$2 billion to reopen the Palisades Nuclear reactor on Lake Michigan. Closed since 2022, the plant was planned to be reopened in October 2025. After the last approval in September 2023, Taiwan suspended the approval of data centers north of Taoyuan with a capacity of more than 5 MW in 2024, due to power supply shortages. Taiwan aims to phase out nuclear power by 2025. Singapore imposed a ban on the opening of data centers in 2019 due to electric power, but in 2022, lifted this ban. Although most nuclear plants in Japan have been shut down after the 2011 Fukushima nuclear accident, according to an October 2024 Bloomberg article in Japanese, cloud gaming services company Ubitus, in which Nvidia has a stake, is looking for land in Japan near a nuclear power plant for a new data center for generative AI. On 1 November 2024, the Federal Energy Regulatory Commission (FERC) rejected an application submitted by Talen Energy for approval to supply some electricity from the nuclear power station Susquehanna to Amazon's data center. According to the Commission Chairman Willie L. Phillips, it is a burden on the electricity grid as well as a significant cost shifting concern to households and other business sectors. In 2025, a report prepared by the IEA estimated the greenhouse gas emissions from the energy consumption of AI at 180 million tons. By 2035, these emissions could rise to 300–500 million tonnes depending on what measures will be taken. This is below 1.5% of the energy sector emissions. The emissions reduction potential of AI was estimated at 5% of the energy sector emissions, but rebound effects (for example if people switch from public transport to autonomous cars) can reduce it.
==== Misinformation ====