--- title: "Apollo program" chunk: 8/12 source: "https://en.wikipedia.org/wiki/Apollo_program" category: "reference" tags: "science, encyclopedia" date_saved: "2026-05-05T12:32:53.499827+00:00" instance: "kb-cron" --- Grissom, White, and Chaffee decided to name their flight Apollo 1 as a motivational focus on the first crewed flight. They trained and conducted tests of their spacecraft at North American, and in the altitude chamber at the Kennedy Space Center. A "plugs-out" test was planned for January, which would simulate a launch countdown on LC-34 with the spacecraft transferring from pad-supplied to internal power. If successful, this would be followed by a more rigorous countdown simulation test closer to the February 21 launch, with both spacecraft and launch vehicle fueled. The plugs-out test began on the morning of January 27, 1967, and immediately was plagued with problems. First, the crew noticed a strange odor in their spacesuits which delayed the sealing of the hatch. Then, communications problems frustrated the astronauts and forced a hold in the simulated countdown. During this hold, an electrical fire began in the cabin and spread quickly in the high pressure, 100% oxygen atmosphere. Pressure rose high enough from the fire that the cabin inner wall burst, allowing the fire to erupt onto the pad area and frustrating attempts to rescue the crew. The astronauts were asphyxiated before the hatch could be opened. NASA immediately convened an accident review board, overseen by both houses of Congress. While the determination of responsibility for the accident was complex, the review board concluded that "deficiencies existed in command module design, workmanship and quality control". At the insistence of NASA Administrator Webb, North American removed Harrison Storms as command module program manager. Webb also reassigned Apollo Spacecraft Program Office (ASPO) Manager Joseph Francis Shea, replacing him with George Low. To remedy the causes of the fire, changes were made in the Block II spacecraft and operational procedures, the most important of which were use of a nitrogen/oxygen mixture instead of pure oxygen before and during launch, and removal of flammable cabin and space suit materials. The Block II design already called for replacement of the Block I plug-type hatch cover with a quick-release, outward opening door. NASA discontinued the crewed Block I program, using the Block I spacecraft only for uncrewed Saturn V flights. Crew members would also exclusively wear modified, fire-resistant A7L Block II space suits, and would be designated by the Block II titles, regardless of whether a LM was present on the flight or not. ==== Uncrewed Saturn V and LM tests ==== On April 24, 1967, Mueller published an official Apollo mission numbering scheme, using sequential numbers for all flights, crewed or uncrewed. The sequence would start with Apollo 4 to cover the first three uncrewed flights while retiring the Apollo 1 designation to honor the crew, per their widows' wishes. In September 1967, Mueller approved a sequence of mission types which had to be accomplished in order to achieve the crewed lunar landing. Each step had to be accomplished before the next ones could be performed, and it was unknown how many tries of each mission would be necessary; therefore letters were used instead of numbers. The A missions were uncrewed Saturn V validation; B was uncrewed LM validation using the Saturn IB; C was crewed CSM Earth orbit validation using the Saturn IB; D was the first crewed CSM/LM flight (this replaced AS-258, using a single Saturn V launch); E would be a higher Earth orbit CSM/LM flight; F would be the first lunar mission, testing the LM in lunar orbit but without landing (a "dress rehearsal"); and G would be the first crewed landing. The list of types covered follow-on lunar exploration to include H lunar landings, I for lunar orbital survey missions, and J for extended-stay lunar landings. The delay in the CSM caused by the fire enabled NASA to catch up on human-rating the LM and Saturn V. Apollo 4 (AS-501) was the first uncrewed flight of the Saturn V, carrying a Block I CSM on November 9, 1967. The capability of the command module's heat shield to survive a trans-lunar reentry was demonstrated by using the service module engine to ram it into the atmosphere at higher than the usual Earth-orbital reentry speed. Apollo 5 (AS-204) was the first uncrewed test flight of the LM in Earth orbit, launched from pad 37 on January 22, 1968, by the Saturn IB that would have been used for Apollo 1. The LM engines were successfully test-fired and restarted, despite a computer programming error, which cut short the first descent stage firing. The ascent engine was fired in abort mode, known as a "fire-in-the-hole" test, where it was lit simultaneously with jettison of the descent stage. Although Grumman wanted a second uncrewed test, George Low decided the next LM flight would be crewed. This was followed on April 4, 1968, by Apollo 6 (AS-502) which carried a CSM and a LM Test Article as ballast. The intent of this mission was to achieve trans-lunar injection, followed closely by a simulated direct-return abort, using the service module engine to achieve another high-speed reentry. The Saturn V experienced pogo oscillation, a problem caused by non-steady engine combustion, which damaged fuel lines in the second and third stages. Two S-II engines shut down prematurely, but the remaining engines were able to compensate. The damage to the third stage engine was more severe, preventing it from restarting for trans-lunar injection. Mission controllers were able to use the service module engine to essentially repeat the flight profile of Apollo 4. Based on the good performance of Apollo 6 and identification of satisfactory fixes to the Apollo 6 problems, NASA declared the Saturn V ready to fly crew, canceling a third uncrewed test. === Crewed development missions ===